From Adam Parast:
Sound Transit is starting to study the north Link alignment (from
Northgate the Lynnwood) and I wrote about the three possible
alignments on the Seattle Transit Blog.
http://seattletransitblog.com/2010/10/26/a-look-at-north-link-alignment-alternatives/
Both us at the blog and Sound Transit would love to hear from local residents.
As this process start to take off we'll be increasing our coverage of
events. We have been covering East Link very closely and would like to
do to do the same for the north end.
Adam Parast
Seattle Transit Blog
Associate Editor
No comments:
Post a Comment